
This project required specialized technological requirements to meet the needs of a medical and dental facility. The building program required specific technical requirements. The solution works with curves, bold angles and sculptural building volumes. Green building strategies are incorporated into the project whenever possible. A trellis provides shading for passive cooling and vertical slices of glazing allow maximum penetration of light and optimization of views.